¡Yami Wo Saku Michi New Edition(Bunshun Bunko)
¡Yoshimura Akira / Cho

 Description
[Machine Translation] Construction of the Tanna Tunnel, an epoch-making new line connecting Atami and Mishima in a short time, began in 1918, but it took 16 years to complete. The construction of the tunnel, which crossed a steep fault zone, was far more difficult than initially anticipated, with many lives lost due to collapsing earth masses and tremendous water inflows. This is a powerful long story about man's long and heated struggle with soil and water.


凌 Credits
Akira Yoshimura

Add to Cart

¡ Detailview

TOP

©Neowing co.